Lowara pump replacement at Tintagel Street

The problem

A failed Lowara pump was putting a plant room at risk of flooding. The pumping system needed a reliable replacement before further water ingress could damage surrounding equipment.

What we did

The failed pump was removed and a suitable replacement installed. The installation was checked and tested to confirm reliable operation before the system was returned to service.

The result

The replacement restored reliable drainage and reduced the risk of further plant-room flooding. The job also provided a straightforward route for future servicing and maintenance.

← Back to our work · Talk to Midland Pumps